The first part of the demolition was to remove three cooling towers within the Continental Center. The cooling towers were welded together so GCD | PDI had to torch the cooling towers apart allowing us to take the cooling towers down safely.
The second part of the demolition included the removal of drywall containing asbestos. Almost the entire building was built with asbestos drywall as 25 of the 26 floors were comprised of it. During the demolition process certain columns, and the HVAC system, needed to remain intact while the demolition process was on-going. Along with the drywall, the ceiling tiles were also required to be taken down. Since the building was declared a historical place in 2021, we needed to take extra caution during their removal. The ceiling tiles were then preserved and salvaged for future use.
Demolition Projects in the USA
We have the people and equipment ready to handle your demolition projects. Call us or email us today!
At GCD | PDI, we have completed thousands of commercial, industrial, plant, structural, selective, and interior demolition projects. Our mission is to work safely and exceed client expectations every day!
Call us at (513) 769 7293 or (859) 881 3366
Email us bid@greencitydemolition.com